Another Set of Preliminary Drawings

I got ANOTHER set of “Preliminary Drawings” from the builder. I don’t know how many different preliminary drawings I’m going to get. These have a 3D diagram of the house (below), foundation plan, floor and attic plan, sheer wall, electrical layout and energy information, cross sections, etc. To me, it seems pretty close to permit …

Off to Engineering and Permit Ready Plans

As of Friday, September 6th, the new plans have been sent off for engineering and permit set. This will take about 4 weeks (maybe less, but hopefully no longer than that). There are some minor changes to these plans as well. Add utility sink in garage (was already on the list, just chose the location, …

(Pre) Preliminary Plans DONE!

The final plan choice is done and I received Preliminary Plans from Lexar Homes. These are brand spankin’ new, so they are not on their website yet, but they will be part of the John Paul Collection soon. Lexar has two categories of plans: Signature and John Paul (special architect). It’s like Toyota vs Lexus …