Excavation Phase 2 – Done

By the end of today, the septic will be installed, drain field is already in, downspouts and footer drains are in, driveway cut in, backfill done and they leveled the lot quite a bit, which was nice. So far, no delays on the project (knock on wood). I’m feeling very overwhelmed with all that’s going …