As of Friday, September 6th, the new plans have been sent off for engineering and permit set. This will take about 4 weeks (maybe less, but hopefully no longer than that). There are some minor changes to these plans as well.
- Add utility sink in garage (was already on the list, just chose the location, which is on other side of the wall from the Powder Room)
- Move the heater in the loft area to the other wall
- Remove the door in the upstairs bathroom