It’s official, it’s in writing with blood, tears and some cash. I’m officially in contract with my builder for my new home! There are 5 phases to designing a home:

  1. Schematic Design – In my case, this was an approved concept.
  2. Design Development – Documenting all the updates desired for the concept plan. Completion of Preliminary Plans that include these updates. **I’m at this stage**
  3. Construction Documents – Once I review the updated Preliminary Plans and make any changes and approve, the plans get finalized into blueprints and engineered
  4. Permit/Bids – Final plans will be submitted for the building permit, getting bids for work. I am getting a bid for the excavation, external drains, driveway, utility trenches and backfill. I have to check with the Town about required water gardens, whatever those are!
  5. Construction Phase – Actual work begins with it’s own phases. I’ll cover these when it’s gets closer